Let’s talk

History

Built on offshore engineering.

ECO TLP’s foundation program began with deep-water wind. Offshore compute builds on that work and an earlier heritage in marine engineering.

Yellow ECO TLP foundation scale model for the 15 MW turbine configuration, with instrumentation in the MARIN test basin.
ECO TLP 15 MW foundation scale-model testing at MARIN, October 2023.

The experience behind the foundation.

F. M. “Bud” Johnson’s career spanned naval architecture, marine engineering and offshore operations, including work at Phillips Petroleum during the development of North Sea oil and gas. That experience shaped the thinking behind ECO TLP.

A deep-water wind opportunity in 2011 set the foundation program in motion. The first concept followed in 2012, leading to model testing, patents and successive design reviews.

From wind foundations to offshore compute

That foundation expertise now supports an off-grid compute design with energy storage, cooling without freshwater consumption, and port-side construction.

  1. 2026

    Further patent granted

    Patent granted for the floating wind turbine foundation.

  2. 2025

    ABS FEED approval

    ABS approved the foundation’s non-site-specific front-end engineering design.

  3. 2023

    15 MW model testing and ABS review

    Model testing at MARIN for a 15 MW turbine configuration, alongside ABS Approval in Principle for the foundation.

    Wide view of the MARIN test basin showing the ECO TLP 15 MW foundation scale model, overhead test equipment and measurement rig.
    The 15 MW foundation scale model in the MARIN test basin, October 2023.
  4. 2018

    U.S. patent granted

    Patent granted for construction, installation, and deployment of an offshore wind turbine on a concrete tension-leg platform.

  5. 2014

    6 MW model testing at MARIN

    Physical model testing for the foundation program.

  6. 2012

    The first foundation concept

    A slip-formed concrete floating foundation developed for offshore wind in deep water.

Foundation milestones

Model testing and ABS design reviews relate to the offshore wind foundation.

Start a conversation

Build your compute with us.

Bring your next compute project offshore. Talk to us about capacity, power, cooling, and the route from fabrication to operation.